国产a一级-国产a网-国产a视频精品免费观看-国产a视频-国产a免费观看-国产a毛片

產品詳情
  • 產品名稱:韓國振動機拋光機

  • 產品型號:TC-15
  • 產品廠商:其它品牌
  • 產品文檔:
你添加了1件商品 查看購物車
簡單介紹:
韓國振動機拋光機此款機器三星,LG 等一系列手機電子廠的噴涂工藝檢測.檢測手機電池背蓋,手機按鍵.手機導航件.手寫筆.聽筒絲網.手機框.等一系列噴涂所需檢測。
詳情介紹:
產品名稱:韓國振動機拋光機  
詳細介紹:韓國振動機拋光機韓國振動機拋光機
 First of all, thank you for buying one of our machines.
 
   We are producing Vibratory Finishing Machines, Vibration applied machines, Precision processing special machines with our accumulated technology and thorough quality systems under our motto that we serve our customers with the best quality products
.
  We would like to introduce, through this manual, how to properly use the machine, to perform its best function in operation that our development and production team have made with their endeavors.
 
  This manual will guide the users to understand the equipment, how to use in the best conditions, how to increase productivity, how to maintain the equipment in the very simple way.
For anything that is not sufficiently described, please feel free to contact our office, then we will supply with further information that we can do.
 
   We hope this equipment will do a good role in your business, Good luck!
 
                      From all the members of Jin Poong B.R. Tech.
 
 
WARRANTY
 
1.Warraty period of this equipment is 1 year or 2000 hours whichever comes first. and warranty period of the electrical parts is 6 months.
 
  This is based on the normal operation, operators mistake or mishandling of the equipment, excessive operation beyond its capability and failure to maintain on time will release the warranty obligation.
 
2. In any case that the user has changed the machine parts or corrected without any prior agreement, this warranty will be invalid..
 
  PAINTING DURABILITY TESTER MACHINE
              MODEL  :  TC - 15 (SM - 1502)
 
I.  COMPOSITION OF THE EQUIPMENT
1. VIBRATORY TUMBLER
2. SOUND COVER
3. AUTO WATER & COMPOUND SUPPLY SYSTEM
4. CONTROL UNIT
   
II.  SPECIFICATION OF THE EQUIPMENT
   1. VIBRATORY TUMBLER
   Tub interior dimension:  W180mm x L530mm
    In-put area dimension:  W130mm x L530mm
   LINING : Hot pour Polyurethane Casting, Thickness: 15mm
   Motor  : 220V x 1Hp x 3ph x 60Hz. (2 pole)
   Motor R.P.M : 3500
 2. SOUND COVER
   L920mm x W620mm x H900mm+120mm
   Top door with Gas Cylinder
 
3. AUTO WATER & COMPOUND SUPPLY SYSTEM
   Water tank, metered to be 500ml
   Water tank, metered to be 1000ml + addition of Compound 200ml
   Water tank, metered to be 500ml + addition of Compound 20ml
   Compound metering pump 300ml/min, adjusted to supply 200 ml by a timer.
   Compound metering pump 20ml/min, adjusted to supply 20 ml by a timer.
 
III. UTILITY REQUIREMENT
    1 Electrical Power:  220V x 1Ph (20A). 
    2 Tap water:  4L/Hr. (To be linked to the  right side of the  control unit by  8mm hose.)
 
IV. INSTALLATION
 
             Just place on the flat concrete floor without any anchoring.
In case the equipment is not horizontally leveled, the mass in the tumbler can move to a side,
please be careful.
 
             Please link 3 wires from the motor to the U.V.W. terminal in the control box.
             Please link 2 wires from the main source of electrical power to the R.T. terminal in the box.
       
             Please link tap water to the supply valve on the right side of the control box by 8mm hose.
             In case Tap water contains some foreign substance, please install pre-filter before this hose.
             Please link a hose(20mm) from the hose nipple on left side of the control box to the main machine.
             A little longer hose is shipped with machine, please cut it off and adjust depending on
the site allocation
       
.            Please link the discharge valve on the rear side of machine to the laboratory discharge pipe line.
             Please leave the discharge valve always open except for the maintenance.
             A compound container needs to be placed in the room under the control box.
             Please remove the top lid and place the container in the room and put a separate lid pre-drilled
on 3 places, 1 big hole in the center and 2 small holes on the right and left.
             On the center hole, please place a level sensor which emit alarm when there is not enough
compound in the container,
and on the right and left holes insert 2 hoses that come from the metering pumps.
       
 
V. OPERATION
 
   Supply the control box with power (put the Breaker switch ON, put the disconnect switch ON) and
put the selector switch ON, then you will have light on the Power lamp.
 Fill the vibratory tumbler with media 15L (11.25L of Cone and 3.75L of Pyramid).
 
Put the Mode to Manu and push on Start.
If the mass turns from front to back, the motor direction is correct.
In case it turns in the opposite direction please correct by changing the wire.
 
1.     PREPARATION COURSE
The media contains some flashes and burrs. This course is, prior to the main course of testing, 
to condition the media by tumbling to the right purpose of the testing.
 
                  First of all, put MODE to Manu and push on PRE WATER-1, then 500ml tank will be filled with water.
                  Pls push on only once, if you push on twice it will be stopped.
O                 Once it is full, it will be automatically disconnected. When the water is evacuated, the tank
 is automatically refilled, therefore from next time, there is no need to put to Manu and fill again.
.
             Set the timer 4 hours or 10 hours as required by your company (currently designated to be 10 hours).
             Put Mode to PRE and push on Start then the tumbler will start to run and 2000 ml of water
will be supplied automatically.(4 times of 500ml)
                  At the time of start, 2000ml will be supplied and 500ml will be supplied every 30 min. automatically.
 
  The tank always keeps water 500ml. and supplies when it is required.
 
2. MAIN COURSE OF TESTING
   
This course is to test whether the testing parts are safe or damaged when the media and parts
have rubbed each other in the vibratory tumbler.
       
First of all, put MODE to Manu and push on MAIN Water-1, then water will be ready with 1000ml
in the tank 1, push on MAIN Water-2 then water will be ready with 500ml in the tank 2.
                  Push on Comp-1, then 200ml of compound will be added to 1000ml of water  in the tank-1.
             Push on Comp-2, then 20ml of compound will be added to 500ml of water in the tank-2.
 
              Pls push on only once, if you push on twice it will be stopped.
              Once you have filled for the first time, when the liquid is evacuated, it is made again automatically
therefore there is no need to do manually again.
             Set the timer 1 hour or 2 hours as required by your company.
             Put the MODE to Manu and start the machine, then 1000mml of water and 200ml of compound
will be automatically supplied in the beginning and 500ml of water and 20ml of compound
will be supplied every 30 min.
        
 (Note) When there is not enough compound, you will have Alarm light on the control panel,
please fill the container with compound.
 
       VI. MAINTENANCE
 
             In case the inverter inside the control box repeats to trip, one of the 3 wires from the motor
might have been disconnected by the vibration. Please take out the vibratory tumbler from the
sound proof box and disassemble the drain pipe lines and lift up the tub and check the wires
from the motor. If any of the wires were disconnected, please correct it.
 
In case there is any loud noise from the vibratory tumbler, the bearings on the motor must have
broken, please replace them referring to the assembly drawing of the motor.
 
In case the liquid of water and compound is not supplied well, some foreign substance might have
been stuck in the ball, please clean the valve referring to the separate manual.
 
 In case compound is not well injected from the metering pump, please clean the balls on the
suction and discharge port of the diaphragm pump.
(Referring to the separate manual, pls clean part No. 2,3,4.)
This may happen after long holidays.
 
Please clean the filter that is installed right after the in-put water valve on the right side of
the control box.
 
VII. WARRANTY & FREE REPLACEMENT
   We warrant quality for either 380 days from the date of shipment or 2000 hours of operation,
whichever comes first. In case any part does not work properly, we send replacement part only.
.                 
韓國振動機拋光機  韓國振動機拋光機
標題:
內容:
聯系人:
聯系電話:
Email:
公司名稱:
聯系地址:
 
 
注:1.可以使用快捷鍵Alt+S或Ctrl+Enter發送信息!
2.如有必要,請您留下您的詳細聯系方式!
點擊這里給我發消息

粵公網安備 44031102000146號

91麻豆精品国产综合久久久| 日韩专区在线播放| 亚洲女初尝黑人巨高清在线观看| 日韩中文字幕一区二区不卡| 欧美另类videosbestsex高清| 韩国三级视频网站| 欧美另类videosbestsex视频| 久久国产影视免费精品| 青青青草影院| 国产视频一区二区在线观看| 亚洲 国产精品 日韩| 日本免费区| 国产欧美精品| 亚洲第一页乱| 91麻豆精品国产片在线观看| 国产亚洲精品aaa大片| 日韩av成人| 青青青草影院| 免费一级片在线观看| 欧美激情一区二区三区在线| 欧美α片无限看在线观看免费| 欧美激情影院| 国产91精品一区二区| 国产成人啪精品| 国产伦精品一区二区三区在线观看| 99热精品一区| 国产91精品一区二区| 国产视频在线免费观看| 91麻豆国产| 国产麻豆精品高清在线播放| 精品国产一区二区三区久| 韩国三级一区| 欧美日本二区| 九九久久国产精品大片| 国产视频久久久| 欧美大片一区| 免费一级片在线观看| 日日日夜夜操| 国产韩国精品一区二区三区| 免费一级片在线观看| 精品视频在线观看视频免费视频| 欧美大片aaaa一级毛片| 国产不卡福利| 久久精品店| 国产不卡福利| 亚欧成人乱码一区二区| 亚洲女初尝黑人巨高清在线观看| 国产视频网站在线观看| 国产不卡高清| 国产精品免费精品自在线观看| 日韩专区在线播放| 欧美α片无限看在线观看免费| 一级毛片看真人在线视频| 99热精品一区| 国产麻豆精品免费密入口| 国产国语在线播放视频| 四虎论坛| 日本特黄特黄aaaaa大片| 国产视频一区二区在线观看 | 日韩一级黄色片| 国产极品精频在线观看| 日本特黄特黄aaaaa大片| 九九九网站| a级精品九九九大片免费看| 日本免费区| 午夜家庭影院| 99色视频在线| 日本在线播放一区| 一级毛片视频播放| 九九九网站| 国产精品自拍在线| 日本免费乱理伦片在线观看2018| 国产一区国产二区国产三区| 夜夜操网| 欧美国产日韩一区二区三区| 欧美日本免费| 毛片高清| 一本高清在线| 国产视频一区二区在线播放| 91麻豆国产福利精品| 九九九国产| 国产高清在线精品一区a| 999精品在线| 免费国产一级特黄aa大片在线| 麻豆网站在线看| 日韩中文字幕在线观看视频| 一级毛片视频播放| 日韩在线观看免费完整版视频| 美女被草网站| 午夜家庭影院| 久久久久久久免费视频| 日韩女人做爰大片| 精品在线观看国产| 亚欧乱色一区二区三区| 久久精品道一区二区三区| 国产一区二区精品久久91| 一本高清在线| 精品视频免费在线| 香蕉视频一级| 日本免费乱理伦片在线观看2018| 中文字幕一区二区三区精彩视频| 九九免费高清在线观看视频| 日韩中文字幕一区| 九九久久国产精品| 青青久久精品| 美女被草网站| 香蕉视频一级| 国产视频在线免费观看| 国产福利免费观看| 亚洲 欧美 成人日韩| 欧美激情一区二区三区视频| 日韩免费在线观看视频| 亚洲精品永久一区| 精品国产亚洲一区二区三区| 九九精品在线| 香蕉视频久久| 日韩综合| 九九久久国产精品大片| 99色视频| 中文字幕一区二区三区 精品| 欧美激情一区二区三区在线播放 | 天天做日日爱| 二级片在线观看| 日本特黄特黄aaaaa大片| 国产伦理精品| 国产极品精频在线观看| 亚欧成人乱码一区二区| 欧美国产日韩久久久| 午夜激情视频在线播放| 欧美大片aaaa一级毛片| 国产伦精品一区二区三区在线观看| 国产麻豆精品| 日韩一级黄色大片| 成人免费一级毛片在线播放视频| 麻豆系列 在线视频| 亚洲第一色在线| 91麻豆tv| 欧美另类videosbestsex视频| 免费国产在线观看不卡| 久久国产精品自线拍免费| 精品国产一区二区三区精东影业 | 日韩欧美一二三区| 精品国产一区二区三区精东影业| 精品国产亚洲一区二区三区| 97视频免费在线观看| 日本免费乱人伦在线观看| 成人免费高清视频| 国产精品1024在线永久免费| 久久久久久久男人的天堂| 99色视频在线| 国产高清在线精品一区二区| 999精品在线| 欧美一级视频免费| 麻豆污视频| 国产原创中文字幕| 国产麻豆精品高清在线播放| 麻豆系列 在线视频| 国产欧美精品午夜在线播放| 国产不卡高清在线观看视频 | 日本特黄特色aaa大片免费| 国产伦久视频免费观看 视频| 亚洲精品影院| 午夜激情视频在线观看| 国产精品免费久久| 亚飞与亚基在线观看| 一级片片| 亚洲第一页乱| 免费国产一级特黄aa大片在线| 91麻豆精品国产综合久久久| 欧美大片a一级毛片视频| 人人干人人插| 91麻豆精品国产高清在线| 欧美激情在线精品video| 午夜欧美成人香蕉剧场| 美女免费毛片| 欧美激情一区二区三区视频高清 | 国产伦精品一区二区三区无广告| 成人高清护士在线播放| 九九久久国产精品| 欧美a级片免费看| 亚洲第一页乱| 国产福利免费观看| 成人高清视频在线观看| 欧美激情一区二区三区在线 | 欧美一区二区三区在线观看| 日本伦理黄色大片在线观看网站| 日韩中文字幕一区二区不卡| 天天做人人爱夜夜爽2020毛片| 国产一级强片在线观看| 成人免费福利片在线观看| 九九干| 欧美α片无限看在线观看免费| 国产不卡在线观看| 香蕉视频久久| 日韩综合| 精品毛片视频| 亚洲天堂在线播放| 亚久久伊人精品青青草原2020| 91麻豆爱豆果冻天美星空| 午夜家庭影院|